Desert Palm BESS (ERCOT-26INR0555) — Project Summary

Queue ID
ERCOT-26INR0555
Capacity
201.3 MW
Technology
Battery
Status
active
Location
Dimmit, TX
Region
ERCOT
Developer
Desert Palm BESS LLC
IA Status
Facility Study

Desert Palm BESS

ERCOT-26INR0555BetaActiveBatteryERCOTLBNL + Live

201.3 MW storage in Dimmit, TX · In queue since August 2024 · Proposed COD July 2027

201.3 MW

Capacity

1

Components

Battery

1y 9m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

2y 11m

Facilities Study50%
Queue EntryAug 16, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-07-01

About

The Desert Palm BESS project is a proposed 201.3 MW battery storage project located in Dimmit County, Texas. The developer is Desert Palm BESS LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-26INR0555, with a queue entry date of August 16, 2024, and a proposed commercial operation date of July 1, 2027. The project's interconnection status is currently in the Facility Study phase.

The proposed project consists of 201.3 MW of battery storage. The point of interconnection is the 78280 Bevo Substation at 138 kV. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Dimmit

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Desert Palm BESS LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

78280 Bevo Substation 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CARRIZO_ESR1
POI Substation
Bevo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.