Coda BESS (ERCOT-26INR0599) — Project Summary

Queue ID
ERCOT-26INR0599
Capacity
202 MW
Technology
Battery
Status
active
Location
San Patricio, TX
Region
ERCOT
Developer
Coda BESS, LLC
IA Status

Coda BESS

ERCOT-26INR0599BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

202 MW hybrid in San Patricio, TX · In queue since January 2025 · Proposed COD July 2028

202 MW

Capacity

0

Components

1y 4m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 6m

Pre-Study0%
Queue EntryJan 28, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-31

About

The Coda BESS project is a proposed 202 MW hybrid battery energy storage system located in San Patricio County, Texas. Developed by Coda BESS, LLC, the project consists of battery energy storage paired with an unspecified "other" technology. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0599, with a queue entry date of January 28, 2025, and a proposed commercial operation date of July 31, 2028.

The point of interconnection for the project is the Mayo 138kV substation (#80258). The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Coda BESS, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

(#80258) Mayo 138kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.