Scorpius Solar (ERCOT-26INR0609) — Project Summary

Queue ID
ERCOT-26INR0609
Capacity
500 MW
Technology
Solar
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Ben Milam Solar 4
IA Status
Facility Study

Scorpius Solar

ERCOT-26INR0609BetaActiveSolarERCOTLBNL + Live

500 MW generation in Milam, TX · In queue since December 2024 · Proposed COD June 2029

500 MW

Capacity

1

Components

Solar

1y 5m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryDec 16, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-14

About

The Scorpius Solar project is a proposed 500 MW solar generation facility located in Milam County, Texas. The project, developed by Ben Milam Solar 4, is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0609, with a queue entry date of December 16, 2024. The proposed commercial operation date is June 14, 2029, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 500 MW of solar photovoltaic generation. It is planned to interconnect at the 3377 LTPSW 345KV point of interconnection. The Scorpius Solar project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Ben Milam Solar 4

Utility

Entity

ERCOT

Service Type

Point of Interconnection

3377 LTPSW 345KV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.