Bonham Storage SLF (ERCOT-26INR0619) — Project Summary

Queue ID
ERCOT-26INR0619
Capacity
104.92 MW
Technology
Battery
Status
active
Location
Limestone, TX
Region
ERCOT
Developer
J&J Solar Ranch LLC
IA Status

Bonham Storage SLF

ERCOT-26INR0619BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

104.92 MW hybrid in Limestone, TX · In queue since January 2025 · Proposed COD April 2027

104.92 MW

Capacity

0

Components

1y 4m

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

2y 3m

Pre-Study0%
Queue EntryJan 28, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-04-05

About

The Bonham Storage SLF project is a proposed 104.92 MW hybrid battery energy storage project located in Limestone County, Texas. Developed by J&J Solar Ranch LLC, the project consists of battery storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0619, with a queue entry date of January 28, 2025, and a proposed commercial operation date of April 5, 2027.

The point of interconnection for the project is Tap 138kV 3632 Mexia_Main - 3634 Groesbeck_Main.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Limestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

J&J Solar Ranch LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 3632 Mexia_Main - 3634 Groesbeck_Main

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Bonham Storage SLF