Dempsey Solar SLF (ERCOT-26INR0632) — Project Summary

Queue ID
ERCOT-26INR0632
Capacity
245.34 MW
Technology
Solar
Status
active
Location
Leon, TX
Region
ERCOT
Developer
Dempsey Solar LLC
IA Status

Dempsey Solar SLF

ERCOT-26INR0632BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

245.34 MW generation in Leon, TX · In queue since February 2025 · Proposed COD September 2028

245.34 MW

Capacity

0

Components

1y 3m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 7m

Pre-Study0%
Queue EntryFeb 25, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-08

About

The Dempsey Solar SLF project is a proposed 245.34 MW solar generation project located in Leon County, Texas. Developed by Dempsey Solar LLC, the project is interconnected within the Electric Reliability Council of Texas (ERCOT) region. The proposed point of interconnection (POI) is at the Tap 138 KV Ridge (#37)-Robertson (#32) line; BEPC.

The project, identified by queue ID ERCOT-26INR0632, entered the ERCOT interconnection queue on February 25, 2025. The proposed commercial operation date (COD) is September 8, 2028. As of the current data, the project has an active status in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Leon

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Dempsey Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138 KV Ridge (#37)-Robertson (#32) line; BEPC

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.