Aquila Solar (ERCOT-26INR0635) — Project Summary

Queue ID
ERCOT-26INR0635
Capacity
500 MW
Technology
Solar
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Ben Milam Solar 5
IA Status

Aquila Solar

ERCOT-26INR0635BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

500 MW generation in Milam, TX · In queue since November 2025 · Proposed COD November 2026

500 MW

Capacity

0

Components

6 months

In Queue

IA Status

COD target: 2026

Interconnection

Total Duration

1 year

Pre-Study0%
Queue EntryNov 18, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-11-12

About

The Aquila Solar project is a proposed 500 MW solar photovoltaic generation facility in Milam County, Texas. Developed by Ben Milam Solar 5, the project is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0635, with a queue entry date of November 18, 2025. The proposed commercial operation date is November 12, 2026.

The project will interconnect at the 3706 Gibson Switch 345kV point of interconnection.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Ben Milam Solar 5

Utility

Entity

ERCOT

Service Type

Point of Interconnection

3706 Gibson Switch 345kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.