Amberjack2 BESS
180 MW hybrid in Cameron, TX · In queue since January 2025 · Proposed COD March 2027
180 MW
Capacity
0
Components
1y 4m
In Queue
—
IA Status
COD target: 2027
Total Duration
2y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-03-08
The Amberjack2 BESS project is a proposed 180 MW hybrid battery energy storage project located in Cameron County, Texas. Developed by Hunt Energy Network, LLC, it is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0640, with a queue entry date of January 28, 2025. The proposed commercial operation date is March 8, 2027.
The project is a hybrid facility consisting of battery energy storage paired with another unspecified technology. It is interconnected to the grid at the 79501 KINGFISHER 345KV point of interconnection. The Amberjack2 BESS project has appeared in recent news coverage regarding energy storage development in Texas.
Generated from interconnection queue and public data sources
State
TX
County
Cameron
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hunt Energy Network, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
79501 KINGFISHER 345KV
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Kingfisher Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.