Wake Wind Energy Repower
251.3 MW generation in Crosby, TX · In queue since April 2025 · Proposed COD May 2027
251.3 MW
Capacity
0
Components
1y 1m
In Queue
—
IA Status
COD target: 2027
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-05-01
The Wake Wind Energy Repower project is a proposed 251.3 MW wind generation project located in Crosby County, Texas. The developer is WAKE WIND ENERGY. It is listed in the ERCOT interconnection queue as entry ERCOT-26INR0647, with a queue entry date of April 21, 2025, and a proposed commercial operation date of May 1, 2027.
The project is linked to the existing Wake Wind Energy Center operating plant (EIA ID 58766). The Wake Wind Energy Repower project has been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Crosby
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
WAKE WIND ENERGY
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
59904 Cottonwood 345
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- WAKEWE_ALL
- POI Substation
- Wake Wind Wind Energy Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26