Wake Wind Energy Repower (ERCOT-26INR0647) — Project Summary

Queue ID
ERCOT-26INR0647
Capacity
251.3 MW
Technology
Wind
Status
active
Location
Crosby, TX
Region
ERCOT
Developer
WAKE WIND ENERGY
IA Status

Wake Wind Energy Repower

ERCOT-26INR0647BetaActiveWindWind TurbineERCOTLive · ERCOT

251.3 MW generation in Crosby, TX · In queue since April 2025 · Proposed COD May 2027

251.3 MW

Capacity

0

Components

1y 1m

In Queue

IA Status

COD target: 2027

Status
as of 8y 2m ago
Latest activitytechnology_launchWindpower Engineering & Development · 2018-03-21
Interconnection

Total Duration

2y 1m

Pre-Study0%
Queue EntryApr 21, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-05-01

About

The Wake Wind Energy Repower project is a proposed 251.3 MW wind generation project located in Crosby County, Texas. The developer is WAKE WIND ENERGY. It is listed in the ERCOT interconnection queue as entry ERCOT-26INR0647, with a queue entry date of April 21, 2025, and a proposed commercial operation date of May 1, 2027.

The project is linked to the existing Wake Wind Energy Center operating plant (EIA ID 58766). The Wake Wind Energy Repower project has been the subject of recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Crosby

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

WAKE WIND ENERGY

Utility

Entity

ERCOT

Service Type

Point of Interconnection

59904 Cottonwood 345

Data Source

Live · ERCOT

CompanyWind Harvest InternationalWindpower Engineering & Development · 2018-03-21
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WAKEWE_ALL
POI Substation
Wake Wind Wind Energy Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26