PHOTON BESS REPOWERING (ERCOT-26INR0725) — Project Summary

Queue ID
ERCOT-26INR0725
Capacity
305.48 MW
Technology
Battery
Status
active
Location
Wharton, TX
Region
ERCOT
Developer
GulfStar Power, LLC
IA Status

PHOTON BESS REPOWERING

ERCOT-26INR0725BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

305.48 MW hybrid in Wharton, TX · In queue since November 2025 · Proposed COD May 2027

305.48 MW

Capacity

0

Components

6 months

In Queue

IA Status

COD target: 2027

Interconnection

Total Duration

1y 6m

Pre-Study0%
Queue EntryNov 5, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-05-17

About

The PHOTON BESS REPOWERING project is a proposed 305.48 MW hybrid battery energy storage development in Wharton County, Texas. Developed by GulfStar Power, LLC, the project consists of battery energy storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-26INR0725, with a queue entry date of November 5, 2025, and a proposed commercial operation date of May 17, 2027.

The project's point of interconnection (POI) is the 44880 Waterh_POI_5 345kV location.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Wharton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

GulfStar Power, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

44880 Waterh_POI_5 345kV

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.