Dundee South B Wind
300.27 MW generation in Baylor, TX · In queue since January 2023 · Proposed COD December 2027
300.27 MW
Capacity
1
Components
Wind
3y 4m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
The Dundee South B Wind project is a proposed wind generation facility with a total capacity of 300.27 MW. Located in Baylor County, Texas, the project is being developed by Felix 2, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0011, with a queue entry date of January 17, 2023.
The proposed commercial operation date for Dundee South B Wind is December 31, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the 345 kV Riley Substation (#6101) operated by AEP.
Generated from interconnection queue and public data sources
State
TX
County
Baylor
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Felix 2, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345 kV Riley Substation (#6101); AEP
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ELECTRAW_1_2
- POI Substation
- Riley Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Dundee South B Wind