Dundee South B Wind (ERCOT-27INR0011) — Project Summary

Queue ID
ERCOT-27INR0011
Capacity
300.27 MW
Technology
Wind
Status
active
Location
Baylor, TX
Region
ERCOT
Developer
Felix 2, LLC
IA Status
Facility Study

Dundee South B Wind

ERCOT-27INR0011BetaActiveWindERCOTLBNL + Live

300.27 MW generation in Baylor, TX · In queue since January 2023 · Proposed COD December 2027

300.27 MW

Capacity

1

Components

Wind

3y 4m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryJan 17, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

The Dundee South B Wind project is a proposed wind generation facility with a total capacity of 300.27 MW. Located in Baylor County, Texas, the project is being developed by Felix 2, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0011, with a queue entry date of January 17, 2023.

The proposed commercial operation date for Dundee South B Wind is December 31, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the 345 kV Riley Substation (#6101) operated by AEP.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Baylor

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Felix 2, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

345 kV Riley Substation (#6101); AEP

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ELECTRAW_1_2
POI Substation
Riley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Dundee South B Wind