Darkwood Solar
150.76 MW generation in Comanche, TX · In queue since June 2023 · Proposed COD September 2027
150.76 MW
Capacity
1
Components
Solar
2y 11m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-20
The Darkwood Solar project is a proposed 150.76 MW solar generation facility in Comanche County, Texas. Developed by Mustang Creek Solar, LLC, the project consists of 150.76 MW of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-27INR0049, with a queue entry date of June 28, 2023, and a proposed commercial operation date of September 20, 2027. The project's interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Darkwood Solar operating plant (EIA ID 68478). Recent news coverage has discussed the development.
Generated from interconnection queue and public data sources
State
TX
County
Comanche
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Mustang Creek Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345KV 1900 Comanche Peak to 1440 Comanche SS
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Proctor Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Darkwood Solar