Darkwood Solar (ERCOT-27INR0049) — Project Summary

Queue ID
ERCOT-27INR0049
Capacity
150.76 MW
Technology
Solar
Status
active
Location
Comanche, TX
Region
ERCOT
Developer
Mustang Creek Solar, LLC
IA Status
Facility Study

Darkwood Solar

ERCOT-27INR0049BetaActiveSolarERCOTLBNL + Live

150.76 MW generation in Comanche, TX · In queue since June 2023 · Proposed COD September 2027

150.76 MW

Capacity

1

Components

Solar

2y 11m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntryJun 28, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-20

About

The Darkwood Solar project is a proposed 150.76 MW solar generation facility in Comanche County, Texas. Developed by Mustang Creek Solar, LLC, the project consists of 150.76 MW of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-27INR0049, with a queue entry date of June 28, 2023, and a proposed commercial operation date of September 20, 2027. The project's interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing Darkwood Solar operating plant (EIA ID 68478). Recent news coverage has discussed the development.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Comanche

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mustang Creek Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345KV 1900 Comanche Peak to 1440 Comanche SS

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Proctor Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.