Aquilla Lake 3 Wind (Alternative POI Oncor 138KV) (ERCOT-27INR0052) — Project Summary

Queue ID
ERCOT-27INR0052
Capacity
225.62 MW
Technology
Wind
Status
suspended
Location
Hill, TX
Region
ERCOT
Developer
IA Status

Aquilla Lake 3 Wind (Alternative POI Oncor 138KV)

ERCOT-27INR0052BetaSuspendedWindERCOTLBNL

225.62 MW generation in Hill, TX · In queue since August 2023

225.62 MW

Capacity

1

Components

Wind

2y 9m

In Queue

IA Status

Interconnection

Total Duration

2y 9m

Suspended0%
Queue EntryAug 14, 2023

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

The Aquilla Lake 3 Wind (Alternative POI Oncor 138KV) project is a proposed wind generation facility with a total capacity of 225.62 MW. The project is located in Hill County, Texas, and is being developed within the Electric Reliability Council of Texas (ERCOT) region. It entered the ERCOT interconnection queue as project ERCOT-27INR0052 on August 14, 2023. The project's status is currently listed as suspended.

The proposed project consists of 225.62 MW of wind generation capacity.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Hill

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Utility

Entity

ERCOT

Service Type

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.