Laurel Wind Energy Center (ERCOT-27INR0056) — Project Summary

Queue ID
ERCOT-27INR0056
Capacity
501.76 MW
Technology
Wind
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
Laurel Energy Center, LLC
IA Status
Facility Study

Laurel Wind Energy Center

ERCOT-27INR0056BetaActiveWindERCOTLBNL + Live

501.76 MW generation in Pecos, TX · In queue since June 2023 · Proposed COD December 2027

501.76 MW

Capacity

1

Components

Wind

2y 11m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 6m

Facilities Study50%
Queue EntryJun 28, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

The Laurel Wind Energy Center is a proposed wind generation project with a total capacity of 501.76 MW. It is located in Pecos County, Texas, and is being developed by Laurel Energy Center, LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0056, with a queue entry date of June 28, 2023. The proposed commercial operation date is December 31, 2027, and the interconnection agreement status is currently in the Facility Study phase.

The proposed project consists solely of wind generation, with the entire 501.76 MW capacity attributed to wind turbines. The point of interconnection is the Solstice to Bakersfield (Bus# 60404 -76002) 345kV Ckt 2 line tap. The Laurel Wind Energy Center has been the subject of recent news coverage, appearing in seven news articles related to the energy industry and grid infrastructure.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Laurel Energy Center, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Solstice to Bakersfield (Bus# 60404 -76002) 345kV Ckt 2 line tap

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.