Laurel Storage Energy Center (ERCOT-27INR0080) — Project Summary

Queue ID
ERCOT-27INR0080
Capacity
200.8 MW
Technology
Battery
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
Laurel Energy Center, LLC
IA Status
Facility Study

Laurel Storage Energy Center

ERCOT-27INR0080BetaActiveBatteryERCOTLBNL

200.8 MW storage in Pecos, TX · In queue since September 2023 · Proposed COD January 2027

200.8 MW

Capacity

1

Components

Battery

2y 8m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 4m

Facilities Study50%
Queue EntrySep 7, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-01-31

About

The Laurel Storage Energy Center is a proposed 200.8 MW battery storage project located in Pecos County, Texas. The project, developed by Laurel Energy Center, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0080, with a queue entry date of September 7, 2023. The proposed commercial operation date is January 31, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The project consists of 200.8 MW of battery storage capacity. The point of interconnection is Tap 345kV 60404 Solstice - 76002 Bakersfield Ckt 2. The Laurel Storage Energy Center has been the subject of recent news coverage, with three articles categorized as industry and regulatory news.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Laurel Energy Center, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 60404 Solstice - 76002 Bakersfield Ckt 2

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HOVEY_GEN
POI Substation
Solstice Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.