Tumbleweed Solar (ERCOT-27INR0086) — Project Summary

Queue ID
ERCOT-27INR0086
Capacity
613.89 MW
Technology
Solar
Status
active
Location
Borden, TX
Region
ERCOT
Developer
Hecate Energy Tumbleweed Solar LLC
IA Status
Facility Study

Tumbleweed Solar

ERCOT-27INR0086BetaActiveSolarERCOTLBNL + Live

613.89 MW generation in Borden, TX · In queue since September 2023 · Proposed COD December 2027

613.89 MW

Capacity

1

Components

Solar

2y 8m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntrySep 22, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

Tumbleweed Solar is a proposed 613.89 MW solar generation project in Borden County, Texas. The project, developed by Hecate Energy Tumbleweed Solar LLC, is located within the ERCOT region and interconnected to the 59905 Faraday 345 kV point of interconnection. It entered the ERCOT interconnection queue as project ERCOT-27INR0086 on September 22, 2023, with a proposed commercial operation date of December 1, 2027. The project's interconnection status is currently in the Facility Study phase.

The Tumbleweed Solar project has been mentioned in recent news coverage related to the electric grid.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Borden

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Energy Tumbleweed Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

59905 Faraday 345 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Faraday Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.