Antonio Road BESS (ERCOT-27INR0090) — Project Summary

Queue ID
ERCOT-27INR0090
Capacity
155.52 MW
Technology
Battery
Status
active
Location
Bastrop, TX
Region
ERCOT
Developer
Tempus Power management LLC
IA Status
Facility Study

Antonio Road BESS

ERCOT-27INR0090BetaActiveBatteryERCOTLBNL + Live

155.52 MW storage in Bastrop, TX · In queue since October 2023 · Proposed COD June 2027

155.52 MW

Capacity

1

Components

Battery

2y 7m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 8m

Facilities Study50%
Queue EntryOct 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-01

About

The Antonio Road BESS project is a proposed 155.52 MW battery storage project located in Bastrop County, Texas. Developed by Tempus Power Management LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0090, with a queue entry date of October 13, 2023. The proposed commercial operation date is June 1, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is the Paige 138kV bus number 7308, connecting to the existing substation via the addition of a breaker. The Antonio Road BESS project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bastrop

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tempus Power management LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Paige 138kV, bus number 7308, connecting to the existing substation via adding a breaker

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Antonio Road BESS