Oak Tree Energy Storage
310.2 MW storage in Lavaca, TX · In queue since December 2023 · Proposed COD August 2029
310.2 MW
Capacity
1
Components
Battery
2y 5m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
5y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-08-01
Oak Tree Energy Storage is a proposed 310.2 MW battery storage project in Lavaca County, Texas. Developed by Live Oak Energy Storage, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0091, with a queue entry date of December 4, 2023. The proposed commercial operation date is August 1, 2029, and the project's interconnection agreement status is currently in the Facility Study phase.
The project consists entirely of battery storage with a total capacity of 310.2 MW. The point of interconnection is Tap Shaula (#5380) _x0013_ South Texas (#5915). The Oak Tree Energy Storage project has been the subject of recent news coverage, including reports on deals and industry developments.
Generated from interconnection queue and public data sources
State
TX
County
Lavaca
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Live Oak Energy Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap Shaula (#5380) _x0013_ South Texas (#5915)
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.