Pecan BESS (ERCOT-27INR0092) — Project Summary

Queue ID
ERCOT-27INR0092
Capacity
157.12 MW
Technology
Battery
Status
active
Location
Leon, TX
Region
ERCOT
Developer
Gransolar Texas Three LLC
IA Status
Facility Study

Pecan BESS

ERCOT-27INR0092BetaActiveBatteryERCOTLBNL + Live

157.12 MW storage in Leon, TX · In queue since October 2023 · Proposed COD December 2028

157.12 MW

Capacity

1

Components

Battery

2y 7m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

5y 2m

Facilities Study50%
Queue EntryOct 25, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

About

The Pecan BESS project is a proposed 157.12 MW battery storage project located in Leon County, Texas. Developed by Gransolar Texas Three LLC, the project consists entirely of battery storage. It is listed in the ERCOT interconnection queue as entry ERCOT-27INR0092, with a queue entry date of October 25, 2023, and a proposed commercial operation date of December 31, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed project is linked to an existing operating plant, Pecan BESS (EIA plant ID 67774), with a match confidence of 83%.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Leon

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gransolar Texas Three LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

(PSSE BUS# 47) HILTOPLKS8 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
POI Substation
Hilltop Lakes Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.