Bulldog Power
300.75 MW generation in Brazoria, TX · In queue since November 2023 · Proposed COD December 2027
300.75 MW
Capacity
1
Components
Gas
2y 6m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-18
Bulldog Power is a proposed 300.75 MW natural gas generation project located in Brazoria County, Texas. Developed by Bulldog Power LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0095, with a queue entry date of November 14, 2023. The proposed commercial operation date is December 18, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 39703 TNMP FM524 Substation at 138kV.
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Bulldog Power LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
39703 TNMP FM524 Substation 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Bulldog Power