Silver Spur Energy Center (ERCOT-27INR0099) — Project Summary

Queue ID
ERCOT-27INR0099
Capacity
200.83 MW
Technology
Battery
Status
active
Location
Brazos, TX
Region
ERCOT
Developer
Silver Spur Energy Center, LLC
IA Status
Facility Study

Silver Spur Energy Center

ERCOT-27INR0099BetaActiveBatteryERCOTLBNL

200.83 MW storage in Brazos, TX · In queue since December 2023 · Proposed COD February 2027

200.83 MW

Capacity

1

Components

Battery

2y 5m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 2m

Facilities Study50%
Queue EntryDec 4, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-02-01

About

The Silver Spur Energy Center is a proposed 200.83 MW battery storage project located in Brazos County, Texas. Developed by Silver Spur Energy Center, LLC, the project entered the ERCOT interconnection queue as queue ID ERCOT-27INR0099 on December 4, 2023. The current interconnection status is "Facility Study," and the proposed commercial operation date is February 1, 2027.

The project consists entirely of battery storage, with a total capacity of 200.83 MW. The point of interconnection is the TAP BRYN_WBRN (BUS #32895) - MILL_SW138 (BUS #32856) 138 KV LINE. The Silver Spur Energy Center has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Brazos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Silver Spur Energy Center, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

TAP BRYN_WBRN (BUS #32895) - MILL_SW138 (BUS #32856) 138 KV LINE

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.