Silver Dollar Solar (ERCOT-27INR0186) — Project Summary

Queue ID
ERCOT-27INR0186
Capacity
301.9 MW
Technology
Solar
Status
active
Location
Freestone, TX
Region
ERCOT
Developer
Silver Dollar Solar Project, LLC
IA Status
Facility Study

Silver Dollar Solar

ERCOT-27INR0186BetaActiveSolarERCOTLBNL + Live

301.9 MW generation in Freestone, TX · In queue since June 2024 · Proposed COD April 2028

301.9 MW

Capacity

1

Components

Solar

1y 11m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 10m

Facilities Study50%
Queue EntryJun 3, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-28

About

Silver Dollar Solar is a proposed solar generation project located in Freestone County, Texas, with a total capacity of 301.9 MW. The project is being developed by Silver Dollar Solar Project, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0186, with a queue entry date of June 3, 2024, and a proposed commercial operation date of April 28, 2028.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2. The proposed project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Freestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Silver Dollar Solar Project, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.