301.9 MW generation in Freestone, TX · In queue since June 2024 · Proposed COD April 2028
301.9 MW
Capacity
1
Components
Solar
1y 11m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-28
Silver Dollar Solar is a proposed solar generation project located in Freestone County, Texas, with a total capacity of 301.9 MW. The project is being developed by Silver Dollar Solar Project, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0186, with a queue entry date of June 3, 2024, and a proposed commercial operation date of April 28, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2. The proposed project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Freestone
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Silver Dollar Solar Project, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV Big Brown 3380 to Navarro 68091 ckt#2
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW