Maddox Solar
101.3 MW generation in Grayson, TX · In queue since May 2024 · Proposed COD April 2028
101.3 MW
Capacity
1
Components
Solar
2 years
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-01
Maddox Solar is a proposed 101.3 MW solar generation project located in Grayson County, Texas. The developer is Industrial Lima Project LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0234, with a queue entry date of May 9, 2024, and a proposed commercial operation date of April 1, 2028. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is Tap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV.
The Maddox Solar project has been the subject of recent news coverage, with seven articles published across industry, grid, and regulatory categories.
Generated from interconnection queue and public data sources
State
TX
County
Grayson
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Industrial Lima Project LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.