Maddox Solar (ERCOT-27INR0234) — Project Summary

Queue ID
ERCOT-27INR0234
Capacity
101.3 MW
Technology
Solar
Status
active
Location
Grayson, TX
Region
ERCOT
Developer
Industrial Lima Project LLC
IA Status
Facility Study

Maddox Solar

ERCOT-27INR0234BetaActiveSolarERCOTLBNL + Live

101.3 MW generation in Grayson, TX · In queue since May 2024 · Proposed COD April 2028

101.3 MW

Capacity

1

Components

Solar

2 years

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 11m

Facilities Study50%
Queue EntryMay 9, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-01

About

Maddox Solar is a proposed 101.3 MW solar generation project located in Grayson County, Texas. The developer is Industrial Lima Project LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0234, with a queue entry date of May 9, 2024, and a proposed commercial operation date of April 1, 2028. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is Tap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV.

The Maddox Solar project has been the subject of recent news coverage, with seven articles published across industry, grid, and regulatory categories.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Grayson

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Industrial Lima Project LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Maddox Solar