Callan Solar (ERCOT-27INR0241) — Project Summary

Queue ID
ERCOT-27INR0241
Capacity
90.97 MW
Technology
Solar
Status
active
Location
Menard, TX
Region
ERCOT
Developer
Menard PV, LLC
IA Status
Facility Study

Callan Solar

ERCOT-27INR0241BetaActiveSolarERCOTLBNL + Live

90.97 MW generation in Menard, TX · In queue since June 2024 · Proposed COD September 2028

90.97 MW

Capacity

1

Components

Solar

1y 11m

In Queue

Facility Study

IA Status

COD target: 2028

Status
Latest milestonepermission awardedPV Tech · 2025-02-25
Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntryJun 13, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-01

About

Callan Solar is a proposed 90.97 MW solar generation project located in Menard County, Texas. The project, developed by Menard PV, LLC, is in the ERCOT interconnection queue as entry ERCOT-27INR0241, with a queue entry date of June 13, 2024. The proposed commercial operation date is September 1, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection is Tap 69kV 60386 Heartland to 6363 Yellow Jacket. The Callan Solar project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Menard

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Menard PV, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 69kV 60386 Heartland to 6363 Yellow Jacket

Data Source

LBNL + Live

DeveloperLouth Callan RenewablesPV Tech · 2025-02-25
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-14

View all articles

No ask pi reports yet for this entity.

ask pi about Callan Solar