Stonewall Solar
60.2 MW generation in Stonewall, TX · In queue since May 2024 · Proposed COD January 2029
60.2 MW
Capacity
1
Components
Solar
2 years
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-01-15
Stonewall Solar is a proposed 60.2 MW solar generation project located in Stonewall County, Texas. The developer is Stonewall PV, LLC. The project is interconnected within the ERCOT region under queue ID ERCOT-27INR0242, with a queue entry date of May 9, 2024, and a proposed commercial operation date of January 15, 2029. Its interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Stonewall Solar operating plant (EIA ID 67562). Recent news coverage has discussed the project within the context of the energy industry.
Generated from interconnection queue and public data sources
State
TX
County
Stonewall
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Stonewall PV, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
#755 BEPC ASPERMONT 69KV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- HIGH
- POI Substation
- Aspermont Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Stonewall Solar