Easy Wind Energy Center (ERCOT-27INR0246) — Project Summary

Queue ID
ERCOT-27INR0246
Capacity
241.13 MW
Technology
Wind
Status
active
Location
Schleicher, TX
Region
ERCOT
Developer
Easy Wind Energy Center, LLC
IA Status
Facility Study

Easy Wind Energy Center

ERCOT-27INR0246BetaActiveWindERCOTLBNL + Live

241.13 MW generation in Schleicher, TX · In queue since May 2024 · Proposed COD December 2027

241.13 MW

Capacity

1

Components

Wind

2 years

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 7m

Facilities Study50%
Queue EntryMay 20, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

Easy Wind Energy Center is a proposed wind generation project located in Schleicher County, Texas, within the ERCOT region. The project, developed by Easy Wind Energy Center, LLC, has a total capacity of 241.13 MW. It consists entirely of wind generation.

The project entered the ERCOT interconnection queue as ERCOT-27INR0246 on May 20, 2024, with a proposed commercial operation date of December 1, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV #76003 Big Hill - #76005 Schneeman Draw circuit #1. The project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Schleicher

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Easy Wind Energy Center, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV #76003 Big Hill - #76005 Schneeman Draw circuit #1

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.