Double A Solar
132.6 MW generation in Goliad, TX · In queue since June 2024 · Proposed COD May 2027
132.6 MW
Capacity
1
Components
Solar
1y 11m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
2y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-05-31
Double A Solar is a proposed solar generation project located in Goliad County, Texas, with a total capacity of 132.6 MW. The project, being developed by Double A Solar, LLC, is interconnected within the ERCOT region under queue ID ERCOT-27INR0248. The project entered the interconnection queue on June 13, 2024, and has a proposed commercial operation date of May 31, 2027. Its interconnection status is currently in the Facility Study phase.
The proposed project consists of 132.6 MW of solar photovoltaic generation. The point of interconnection is Tap 69kV 5678 Schroeder - 5675 Big Oak. The project has been mentioned in recent news coverage pertaining to regulatory matters.
Generated from interconnection queue and public data sources
State
TX
County
Goliad
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Double A Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 69kV 5678 Schroeder - 5675 Big Oak
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Schroeder Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-14