Tipperary Solar
60.16 MW generation in Schleicher, TX · In queue since June 2024 · Proposed COD March 2028
60.16 MW
Capacity
1
Components
Solar
1y 11m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-15
Tipperary Solar is a proposed 60.16 MW solar generation project located in Schleicher County, Texas. The project is being developed by Tippsol and is interconnected within the ERCOT region under queue ID ERCOT-27INR0261. The project entered the interconnection queue on June 13, 2024, and has a proposed commercial operation date of March 15, 2028. Its interconnection status is currently in the Facility Study phase.
The proposed project consists of 60.16 MW of solar photovoltaic generation. The point of interconnection is the 6498 Live Oak AEP 69kV. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Schleicher
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Tippsol
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
6498 Live Oak AEP 69kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Eldorado Live Oak Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Tipperary Solar