Tipperary Solar (ERCOT-27INR0261) — Project Summary

Queue ID
ERCOT-27INR0261
Capacity
60.16 MW
Technology
Solar
Status
active
Location
Schleicher, TX
Region
ERCOT
Developer
Tippsol
IA Status
Facility Study

Tipperary Solar

ERCOT-27INR0261BetaActiveSolarERCOTLBNL + Live

60.16 MW generation in Schleicher, TX · In queue since June 2024 · Proposed COD March 2028

60.16 MW

Capacity

1

Components

Solar

1y 11m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 9m

Facilities Study50%
Queue EntryJun 13, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-15

About

Tipperary Solar is a proposed 60.16 MW solar generation project located in Schleicher County, Texas. The project is being developed by Tippsol and is interconnected within the ERCOT region under queue ID ERCOT-27INR0261. The project entered the interconnection queue on June 13, 2024, and has a proposed commercial operation date of March 15, 2028. Its interconnection status is currently in the Facility Study phase.

The proposed project consists of 60.16 MW of solar photovoltaic generation. The point of interconnection is the 6498 Live Oak AEP 69kV. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Schleicher

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tippsol

Utility

Entity

ERCOT

Service Type

Point of Interconnection

6498 Live Oak AEP 69kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Eldorado Live Oak Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Tipperary Solar