Red Hollow Renewable Energy BESS SLF
308.6 MW storage in Archer, TX · In queue since June 2024 · Proposed COD September 2028
308.6 MW
Capacity
1
Components
Battery
1y 11m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-18
The Red Hollow Renewable Energy BESS SLF project is a proposed 308.6 MW battery storage project located in Archer County, Texas. The developer is Red Hollow Renewable Energy LLC. It is interconnected within the ERCOT region under queue ID ERCOT-27INR0279, with a queue entry date of June 13, 2024. The proposed commercial operation date is September 18, 2028, and the project's interconnection status is currently in the Facility Study phase.
The project consists solely of battery storage, with a total capacity of 308.6 MW. The point of interconnection is the Tap 345kV 1422 Bowman - 17002 Garvey Road. The project is currently listed as active within the ERCOT interconnection queue.
Generated from interconnection queue and public data sources
State
TX
County
Archer
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Red Hollow Renewable Energy LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 1422 Bowman - 17002 Garvey Road
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Bowman Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.