Red Hollow Renewable Energy BESS SLF (ERCOT-27INR0279) — Project Summary

Queue ID
ERCOT-27INR0279
Capacity
308.6 MW
Technology
Battery
Status
active
Location
Archer, TX
Region
ERCOT
Developer
Red Hollow Renewable Energy LLC
IA Status
Facility Study

Red Hollow Renewable Energy BESS SLF

ERCOT-27INR0279BetaActiveBatteryERCOTLBNL + Live

308.6 MW storage in Archer, TX · In queue since June 2024 · Proposed COD September 2028

308.6 MW

Capacity

1

Components

Battery

1y 11m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntryJun 13, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-18

About

The Red Hollow Renewable Energy BESS SLF project is a proposed 308.6 MW battery storage project located in Archer County, Texas. The developer is Red Hollow Renewable Energy LLC. It is interconnected within the ERCOT region under queue ID ERCOT-27INR0279, with a queue entry date of June 13, 2024. The proposed commercial operation date is September 18, 2028, and the project's interconnection status is currently in the Facility Study phase.

The project consists solely of battery storage, with a total capacity of 308.6 MW. The point of interconnection is the Tap 345kV 1422 Bowman - 17002 Garvey Road. The project is currently listed as active within the ERCOT interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Archer

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Red Hollow Renewable Energy LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 1422 Bowman - 17002 Garvey Road

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Bowman Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.