Donelson Storage SLF (ERCOT-27INR0293) — Project Summary

Queue ID
ERCOT-27INR0293
Capacity
Technology
Battery
Status
active
Location
Red River, TX
Region
ERCOT
Developer
Donelson Storage
IA Status

Donelson Storage SLF

ERCOT-27INR0293BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

hybrid in Red River, TX · In queue since March 2025 · Proposed COD October 2028

Capacity

0

Components

1y 2m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 7m

Pre-Study0%
Queue EntryMar 24, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-17

About

The Donelson Storage SLF project is a proposed hybrid battery storage project located in Red River County, Texas. The project, developed by Donelson Storage, has a total capacity that is not specified in the provided data. It is interconnected within the ERCOT region under queue ID ERCOT-27INR0293, with a queue entry date of March 24, 2025.

The proposed commercial operation date (COD) for the Donelson Storage SLF project is October 17, 2028. The point of interconnection (POI) is at a tap on the 69 kV Bagwell to Clarksville line operated by ONCOR. The interconnection agreement (IA) status is not specified in the provided data. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Red River

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Donelson Storage

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.