Sugar Land Power Plant
147.6 MW generation in Fort Bend, TX · In queue since August 2024 · Proposed COD October 2027
147.6 MW
Capacity
1
Components
Gas
1y 9m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
3y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-01
The Sugar Land Power Plant is a proposed 147.6 MW gas-fired generation project located in Fort Bend County, Texas. Developed by Imperial Power Plant, LLC, the project entered the ERCOT interconnection queue on August 16, 2024, under queue ID ERCOT-27INR0296. Its proposed commercial operation date is October 1, 2027, and its interconnection status is currently in the Facility Study phase.
The project is planned to connect to the tap 138kV 44015 W A Parish - 44671 Stafford CKT 9 point of interconnection. The Sugar Land Power Plant has been the subject of recent news coverage, with articles focusing on deals and regulatory aspects.
Generated from interconnection queue and public data sources
State
TX
County
Fort Bend
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Imperial Power Plant, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 138kV 44015 W A Parish - 44671 Stafford CKT 9
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-14