Please change project entity from Pronghorn Solar, LLC to Beaverhead Solar, LLC.
61.5 MW generation in Jim Wells, TX · In queue since August 2024 · Proposed COD July 2028
61.5 MW
Capacity
1
Components
Solar
1y 9m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-29
ERCOT-27INR0307 is a proposed solar generation project with a total capacity of 61.5 MW. The project, located in Jim Wells County, Texas, is being developed by Pronghorn Solar, LLC, though the project entity is slated to change to Beaverhead Solar, LLC. It is currently in the ERCOT interconnection queue, with an entry date of August 16, 2024, and a proposed commercial operation date of July 29, 2028. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection for the project is planned to be directly to Sub 69kv #5653 Ben Bolt.
Generated from interconnection queue and public data sources
State
TX
County
Jim Wells
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Pronghorn Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Direct to Sub 69kv #5653 Ben Bolt.
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.