Please change project entity from Pronghorn Solar, LLC to Beaverhead Solar, LLC. (ERCOT-27INR0307) — Project Summary

Queue ID
ERCOT-27INR0307
Capacity
61.5 MW
Technology
Solar
Status
active
Location
Jim Wells, TX
Region
ERCOT
Developer
Pronghorn Solar, LLC
IA Status
Facility Study

Please change project entity from Pronghorn Solar, LLC to Beaverhead Solar, LLC.

ERCOT-27INR0307BetaActiveSolarERCOTLBNL + Live

61.5 MW generation in Jim Wells, TX · In queue since August 2024 · Proposed COD July 2028

61.5 MW

Capacity

1

Components

Solar

1y 9m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 11m

Facilities Study50%
Queue EntryAug 16, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-29

About

ERCOT-27INR0307 is a proposed solar generation project with a total capacity of 61.5 MW. The project, located in Jim Wells County, Texas, is being developed by Pronghorn Solar, LLC, though the project entity is slated to change to Beaverhead Solar, LLC. It is currently in the ERCOT interconnection queue, with an entry date of August 16, 2024, and a proposed commercial operation date of July 29, 2028. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection for the project is planned to be directly to Sub 69kv #5653 Ben Bolt.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Jim Wells

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Pronghorn Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Direct to Sub 69kv #5653 Ben Bolt.

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.