Please change project entity from Pronghorn Storage, LLC to Beaverhead Solar, LLC.
61.5 MW storage in Jim Wells, TX · In queue since August 2024 · Proposed COD July 2027
61.5 MW
Capacity
1
Components
Battery
1y 9m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
2y 11m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-07-31
The proposed energy storage project, known in the ERCOT interconnection queue as ERCOT-27INR0308, is a 61.5 MW battery storage facility. Located in Jim Wells County, Texas, the project is being developed by Pronghorn Storage, LLC, though the project entity is slated to change to Beaverhead Solar, LLC. It entered the ERCOT queue on August 16, 2024, with a proposed commercial operation date of July 31, 2027.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is directly to Sub 69kv #5653 Ben Bolt. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
TX
County
Jim Wells
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Pronghorn Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Direct to Sub 69kv #5653 Ben Bolt.
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Please change project entity from Pronghorn Storage, LLC to Beaverhead Solar, LLC.