Perseus Gas (TEF- Due Diligence)
1,056.8 MW generation in Nueces, TX · In queue since August 2024 · Proposed COD December 2028
1,056.8 MW
Capacity
1
Components
Gas
1y 9m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
The Perseus Gas (TEF- Due Diligence) project is a proposed 1056.8 MW gas-fired generation project located in Nueces County, Texas. The developer is Engie Flexible Generation NA LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0320, with a queue entry date of August 16, 2024, and a proposed commercial operation date of December 31, 2028. Its interconnection agreement status is currently in the Facility Study phase.
The proposed project consists of 1056.8 MW of gas-fired generation capacity. The point of interconnection is Tap 345kV 84550 BLULACY 7A _x0013_ 8455 Lon Hill 7A Ckt 2.
Generated from interconnection queue and public data sources
State
TX
County
Nueces
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Engie Flexible Generation NA LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 84550 BLULACY 7A _x0013_ 8455 Lon Hill 7A Ckt 2
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.