Perseus Gas (TEF- Due Diligence) (ERCOT-27INR0320) — Project Summary

Queue ID
ERCOT-27INR0320
Capacity
1056.8 MW
Technology
Gas
Status
active
Location
Nueces, TX
Region
ERCOT
Developer
Engie Flexible Generation NA LLC
IA Status
Facility Study

Perseus Gas (TEF- Due Diligence)

ERCOT-27INR0320BetaActiveGasERCOTLBNL

1,056.8 MW generation in Nueces, TX · In queue since August 2024 · Proposed COD December 2028

1,056.8 MW

Capacity

1

Components

Gas

1y 9m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 4m

Facilities Study50%
Queue EntryAug 16, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

About

The Perseus Gas (TEF- Due Diligence) project is a proposed 1056.8 MW gas-fired generation project located in Nueces County, Texas. The developer is Engie Flexible Generation NA LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0320, with a queue entry date of August 16, 2024, and a proposed commercial operation date of December 31, 2028. Its interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 1056.8 MW of gas-fired generation capacity. The point of interconnection is Tap 345kV 84550 BLULACY 7A _x0013_ 8455 Lon Hill 7A Ckt 2.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Nueces

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Engie Flexible Generation NA LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 84550 BLULACY 7A _x0013_ 8455 Lon Hill 7A Ckt 2

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.