LONE STAR INDUSTRIAL PARK GAS POWER PROJECT (TEF-Due Diligence) (ERCOT-27INR0324) — Project Summary

Queue ID
ERCOT-27INR0324
Capacity
166 MW
Technology
Gas
Status
active
Location
Morris, TX
Region
ERCOT
Developer
LONE STAR INDUSTRIAL PARK, LLC
IA Status
Facility Study

LONE STAR INDUSTRIAL PARK GAS POWER PROJECT (TEF-Due Diligence)

ERCOT-27INR0324BetaActiveGasERCOTLBNL + Live

166 MW generation in Morris, TX · In queue since September 2024 · Proposed COD May 2028

166 MW

Capacity

1

Components

Gas

1y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 8m

Facilities Study50%
Queue EntrySep 4, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-11

About

The LONE STAR INDUSTRIAL PARK GAS POWER PROJECT (TEF-Due Diligence), identified as ERCOT-27INR0324 in the ERCOT interconnection queue, is a proposed 166 MW gas-fired generation project in Morris County, Texas. Developed by LONE STAR INDUSTRIAL PARK, LLC, the project entered the queue on September 4, 2024, with a proposed commercial operation date of May 11, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed project consists of 166 MW of gas-fired capacity. It is slated to connect to the 1795 Monticello SES 138kV point of interconnection. Recent news coverage indicates activity related to deals involving the project.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Morris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

LONE STAR INDUSTRIAL PARK, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1795 Monticello SES 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Monticello substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.