Wild Horse Desert Solar (ERCOT-27INR0330) — Project Summary

Queue ID
ERCOT-27INR0330
Capacity
120 MW
Technology
Solar
Status
active
Location
Dimmit, TX
Region
ERCOT
Developer
Wild Horse Desert Solar, LLC
IA Status
Facility Study

Wild Horse Desert Solar

ERCOT-27INR0330BetaActiveSolarERCOTLBNL + Live

120 MW generation in Dimmit, TX · In queue since December 2024 · Proposed COD July 2028

120 MW

Capacity

1

Components

Solar

1y 5m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 7m

Facilities Study50%
Queue EntryDec 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-07-01

About

Wild Horse Desert Solar is a proposed 120 MW solar generation project located in Dimmit County, Texas. The project, developed by Wild Horse Desert Solar, LLC, is currently in the ERCOT interconnection queue as entry ERCOT-27INR0330, with a queue entry date of December 19, 2024. The proposed commercial operation date is July 1, 2028, and the project's interconnection status is currently in the Facility Study phase.

The point of interconnection for the project is Tap 138kV 8613 Big Well - 8212 Dilley Switch. The project has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Dimmit

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Wild Horse Desert Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138kV 8613 Big Well - 8212 Dilley Switch

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Wild Horse Desert Solar