Tomahawk Road BESS (ERCOT-27INR0341) — Project Summary

Queue ID
ERCOT-27INR0341
Capacity
257.25 MW
Technology
Battery
Status
active
Location
Ector, TX
Region
ERCOT
Developer
Horizon Energy Storage Greenfield Project Holdings LLC
IA Status
Facility Study

Tomahawk Road BESS

ERCOT-27INR0341BetaActiveBatteryERCOTLBNL + Live

257.25 MW storage in Ector, TX · In queue since August 2024 · Proposed COD March 2028

257.25 MW

Capacity

1

Components

Battery

1y 9m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 7m

Facilities Study50%
Queue EntryAug 16, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-01

About

The Tomahawk Road BESS is a proposed energy storage project located in Ector County, Texas, with a total capacity of 257.25 MW. The project, developed by Horizon Energy Storage Greenfield Project Holdings LLC, consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0341, with a queue entry date of August 16, 2024.

The proposed commercial operation date for the Tomahawk Road BESS is March 1, 2028. Its interconnection point is Tap 138 kV 1019 Moss - 1113 Odessa Southwest. The project's interconnection status is currently in the Facility Study phase.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Horizon Energy Storage Greenfield Project Holdings LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 138 kV 1019 Moss - 1113 Odessa Southwest

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Moss Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.