Plant Road BESS (ERCOT-27INR0343) — Project Summary

Queue ID
ERCOT-27INR0343
Capacity
251.32 MW
Technology
Battery
Status
active
Location
Ector, TX
Region
ERCOT
Developer
Horizon Energy Storage Greenfield Project Holdings LLC
IA Status
Facility Study

Plant Road BESS

ERCOT-27INR0343BetaActiveBatteryERCOTLBNL + Live

251.32 MW storage in Ector, TX · In queue since October 2024 · Proposed COD March 2028

251.32 MW

Capacity

1

Components

Battery

1y 7m

In Queue

Facility Study

IA Status

COD target: 2028

Status
Latest milestoneCOD achievedSolar Power World · 2025-11-06
Interconnection

Total Duration

3y 5m

Facilities Study50%
Queue EntryOct 10, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-01

About

Plant Road BESS is a proposed 251.32 MW battery storage project located in Ector County, Texas. The project is being developed by Horizon Energy Storage Greenfield Project Holdings LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-27INR0343, with a queue entry date of October 10, 2024, and a proposed commercial operation date of March 1, 2028. The project's interconnection status is currently in the Facility Study phase.

The Plant Road BESS development has been featured in recent news coverage related to the energy industry and grid infrastructure.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Horizon Energy Storage Greenfield Project Holdings LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1027 ODEHV 138kV

Data Source

LBNL + Live

DeveloperEnel North AmericaSolar Power World · 2025-11-06
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26

View all articles

No ask pi reports yet for this entity.

ask pi about Plant Road BESS