195.8 MW generation in Mitchell, TX · In queue since October 2024 · Proposed COD April 2028
195.8 MW
Capacity
1
Components
Solar
1y 7m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-19
Johnson Grass Solar is a proposed 195.8 MW solar generation project located in Mitchell County, Texas. The project, developed by Johnson Grass Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0348, with a queue entry date of October 1, 2024.
The proposed commercial operation date for Johnson Grass Solar is April 19, 2028. Its interconnection status is currently in the Facility Study phase, with a point of interconnection at Tap 138kV (#11395) Navigation - (#10054) Cattlemen.
Generated from interconnection queue and public data sources
State
TX
County
Mitchell
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Johnson Grass Solar ,LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV (#11395) Navigation - (#10054) Cattlemen
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.