Gardner Draw Solar (ERCOT-27INR0355) — Project Summary

Queue ID
ERCOT-27INR0355
Capacity
200 MW
Technology
Solar
Status
active
Location
Glasscock, TX
Region
ERCOT
Developer
RWE Clean Energy Development, LLC
IA Status
Facility Study

Gardner Draw Solar

ERCOT-27INR0355BetaActiveSolarERCOTLBNL + Live

200 MW generation in Glasscock, TX · In queue since October 2024 · Proposed COD December 2027

200 MW

Capacity

1

Components

Solar

1y 7m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

3y 2m

Facilities Study50%
Queue EntryOct 1, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

The Gardner Draw Solar project is a proposed 200 MW solar generation facility in Glasscock County, Texas. Developed by RWE Clean Energy Development, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0355, with a queue entry date of October 1, 2024.

The proposed commercial operation date for Gardner Draw Solar is December 31, 2027. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the 59902 Sand Bluff 345kV location. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Glasscock

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Clean Energy Development, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

59902 Sand Bluff 345kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Sand Bluff Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.