Cashel BESS
150.44 MW storage in Schleicher, TX · In queue since October 2024 · Proposed COD March 2028
150.44 MW
Capacity
1
Components
Battery
1y 7m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-15
The Cashel BESS project is a proposed 150.44 MW battery storage project located in Schleicher County, Texas. Developed by TIPPSOL LLC, the project consists of a single 150.44 MW battery component. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0364, with a queue entry date of October 29, 2024.
The proposed commercial operation date for the Cashel BESS project is March 15, 2028. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is the 6500 Live Oak AEP 138kV. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Schleicher
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
TIPPSOL LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
6500 Live Oak AEP 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- Eldorado Live Oak Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Cashel BESS