Cashel BESS (ERCOT-27INR0364) — Project Summary

Queue ID
ERCOT-27INR0364
Capacity
150.44 MW
Technology
Battery
Status
active
Location
Schleicher, TX
Region
ERCOT
Developer
TIPPSOL LLC
IA Status
Facility Study

Cashel BESS

ERCOT-27INR0364BetaActiveBatteryERCOTLBNL + Live

150.44 MW storage in Schleicher, TX · In queue since October 2024 · Proposed COD March 2028

150.44 MW

Capacity

1

Components

Battery

1y 7m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 5m

Facilities Study50%
Queue EntryOct 29, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-15

About

The Cashel BESS project is a proposed 150.44 MW battery storage project located in Schleicher County, Texas. Developed by TIPPSOL LLC, the project consists of a single 150.44 MW battery component. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0364, with a queue entry date of October 29, 2024.

The proposed commercial operation date for the Cashel BESS project is March 15, 2028. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is the 6500 Live Oak AEP 138kV. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Schleicher

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

TIPPSOL LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

6500 Live Oak AEP 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Eldorado Live Oak Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Cashel BESS