200.84 MW generation in Bee, TX · In queue since December 2024 · Proposed COD September 2028
200.84 MW
Capacity
1
Components
Solar
1y 5m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
3y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-08
The proposed Abeja Solar Farm is a 200.84 MW solar generation project located in Bee County, Texas. Developed by Abeja Solar, the project is interconnected within the ERCOT region under queue ID ERCOT-27INR0372. It entered the interconnection queue on December 19, 2024, with a proposed commercial operation date of September 8, 2028. The project's interconnection status is currently in the Facility Study phase.
The Abeja Solar Farm project is linked to an existing operating plant of the same name (EIA plant ID 68347). The point of interconnection is Tap 345kV 8606 GODDARD7A - 8689 TANGO7A. The project has also been mentioned in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Bee
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Abeja Solar
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 8606 GODDARD7A - 8689 TANGO7A
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
- POI Substation
- Bee Prison Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.