Abeja Solar Farm (ERCOT-27INR0372) — Project Summary

Queue ID
ERCOT-27INR0372
Capacity
200.84 MW
Technology
Solar
Status
active
Location
Bee, TX
Region
ERCOT
Developer
Abeja Solar
IA Status
Facility Study

Abeja Solar Farm

ERCOT-27INR0372BetaActiveSolarERCOTLBNL + Live

200.84 MW generation in Bee, TX · In queue since December 2024 · Proposed COD September 2028

200.84 MW

Capacity

1

Components

Solar

1y 5m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 9m

Facilities Study50%
Queue EntryDec 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-08

About

The proposed Abeja Solar Farm is a 200.84 MW solar generation project located in Bee County, Texas. Developed by Abeja Solar, the project is interconnected within the ERCOT region under queue ID ERCOT-27INR0372. It entered the interconnection queue on December 19, 2024, with a proposed commercial operation date of September 8, 2028. The project's interconnection status is currently in the Facility Study phase.

The Abeja Solar Farm project is linked to an existing operating plant of the same name (EIA plant ID 68347). The point of interconnection is Tap 345kV 8606 GODDARD7A - 8689 TANGO7A. The project has also been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Bee

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Abeja Solar

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 8606 GODDARD7A - 8689 TANGO7A

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW
POI Substation
Bee Prison Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.