Windjammer Windpower (ERCOT-27INR0383) — Project Summary

Queue ID
ERCOT-27INR0383
Capacity
292.58 MW
Technology
Wind
Status
active
Location
Glasscock, TX
Region
ERCOT
Developer
Windjammer Windpower, LLC
IA Status
Facility Study

Windjammer Windpower

ERCOT-27INR0383BetaActiveWindERCOTLBNL + Live

292.58 MW generation in Glasscock, TX · In queue since September 2024 · Proposed COD December 2028

292.58 MW

Capacity

1

Components

Wind

1y 8m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntrySep 10, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

About

Windjammer Windpower is a proposed wind generation project located in Glasscock County, Texas, with a total capacity of 292.58 MW. The project, developed by Windjammer Windpower, LLC, consists entirely of wind turbines. It is currently in the ERCOT interconnection queue as entry ERCOT-27INR0383, with a queue entry date of September 10, 2024.

The proposed commercial operation date (COD) for Windjammer Windpower is December 31, 2028. The project's interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is at the tap 345kV 59902 Sand Bluff Wind Farm - 59907 Bernoulli.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Glasscock

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Windjammer Windpower, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 345kV 59902 Sand Bluff Wind Farm - 59907 Bernoulli

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.