Windjammer Windpower
292.58 MW generation in Glasscock, TX · In queue since September 2024 · Proposed COD December 2028
292.58 MW
Capacity
1
Components
Wind
1y 8m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
Windjammer Windpower is a proposed wind generation project located in Glasscock County, Texas, with a total capacity of 292.58 MW. The project, developed by Windjammer Windpower, LLC, consists entirely of wind turbines. It is currently in the ERCOT interconnection queue as entry ERCOT-27INR0383, with a queue entry date of September 10, 2024.
The proposed commercial operation date (COD) for Windjammer Windpower is December 31, 2028. The project's interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is at the tap 345kV 59902 Sand Bluff Wind Farm - 59907 Bernoulli.
Generated from interconnection queue and public data sources
State
TX
County
Glasscock
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Windjammer Windpower, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 345kV 59902 Sand Bluff Wind Farm - 59907 Bernoulli
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.