Straight Spur Solar (ERCOT-27INR0385) — Project Summary

Queue ID
ERCOT-27INR0385
Capacity
251.7 MW
Technology
Solar
Status
active
Location
Ector, TX
Region
ERCOT
Developer
ENGIE IR Holdings LLC
IA Status
Facility Study

Straight Spur Solar

ERCOT-27INR0385BetaActiveSolarERCOTLBNL + Live

251.7 MW generation in Ector, TX · In queue since November 2024 · Proposed COD April 2029

251.7 MW

Capacity

1

Components

Solar

1y 6m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

4y 5m

Facilities Study50%
Queue EntryNov 21, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-01

About

Straight Spur Solar is a proposed 251.7 MW solar generation project located in Ector County, Texas. The project, developed by ENGIE IR Holdings LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0385, with a queue entry date of November 21, 2024. The proposed commercial operation date is April 1, 2029, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for Straight Spur Solar is the Tap 345 kV ClearFork (Bus #23876) to Gardenale Switch (Bus #11157). The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ENGIE IR Holdings LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345 kV ClearFork (Bus #23876) to Gardenale Switch (Bus #11157)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Straight Spur Solar