Diamond Sage Solar 1
213.96 MW generation in Webb, TX · In queue since January 2025 · Proposed COD October 2028
213.96 MW
Capacity
0
Components
1y 4m
In Queue
—
IA Status
COD target: 2028
Total Duration
3y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-01
Diamond Sage Solar 1 is a proposed solar generation project located in Webb County, Texas, within the ERCOT region. Developed by DGC Renewables, LLC, the project has a total capacity of 213.96 MW utilizing photovoltaic solar technology.
The project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0390, with a queue entry date of January 28, 2025. The proposed commercial operation date is October 1, 2028.
Generated from interconnection queue and public data sources
State
TX
County
Webb
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
DGC Renewables, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 345kV 80219 LOBO7A - 5709 FOWLER TONSW5 CKT2
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.