Diamond Sage Solar 1 (ERCOT-27INR0390) — Project Summary

Queue ID
ERCOT-27INR0390
Capacity
213.96 MW
Technology
Solar
Status
active
Location
Webb, TX
Region
ERCOT
Developer
DGC Renewables, LLC
IA Status

Diamond Sage Solar 1

ERCOT-27INR0390BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

213.96 MW generation in Webb, TX · In queue since January 2025 · Proposed COD October 2028

213.96 MW

Capacity

0

Components

1y 4m

In Queue

IA Status

COD target: 2028

Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntryJan 28, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-01

About

Diamond Sage Solar 1 is a proposed solar generation project located in Webb County, Texas, within the ERCOT region. Developed by DGC Renewables, LLC, the project has a total capacity of 213.96 MW utilizing photovoltaic solar technology.

The project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0390, with a queue entry date of January 28, 2025. The proposed commercial operation date is October 1, 2028.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Webb

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

DGC Renewables, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

tap 345kV 80219 LOBO7A - 5709 FOWLER TONSW5 CKT2

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Diamond Sage Solar 1