Baker Branch BESS (ERCOT-27INR0409) — Project Summary

Queue ID
ERCOT-27INR0409
Capacity
287.22 MW
Technology
Battery
Status
active
Location
Lamar, TX
Region
ERCOT
Developer
Mockingbird Storage Center, LLC
IA Status

Baker Branch BESS

ERCOT-27INR0409BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

287.22 MW hybrid in Lamar, TX · In queue since June 2025 · Proposed COD April 2029

287.22 MW

Capacity

0

Components

11 months

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

3y 10m

Pre-Study0%
Queue EntryJun 19, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-27

About

The Baker Branch BESS project is a proposed 287.22 MW hybrid battery energy storage project located in Lamar County, Texas. Developed by Mockingbird Storage Center, LLC, the project consists of battery energy storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0409, with a queue entry date of June 19, 2025, and a proposed commercial operation date of April 27, 2029.

The point of interconnection for the Baker Branch BESS project is the Pacific Switch (PACSW) 345 kV Bus 11683. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Lamar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mockingbird Storage Center, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Pacific Switch (PACSW) 345 kV Bus 11683

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Baker Branch BESS