M-Bar BESS I (ERCOT-27INR0422) — Project Summary

Queue ID
ERCOT-27INR0422
Capacity
82.1 MW
Technology
Battery
Status
active
Location
Ector, TX
Region
ERCOT
Developer
M-Bar Energy I, LLC
IA Status
Facility Study

M-Bar BESS I

ERCOT-27INR0422BetaActiveBatteryERCOTLBNL + Live

82.1 MW storage in Ector, TX · In queue since December 2024 · Proposed COD September 2028

82.1 MW

Capacity

1

Components

Battery

1y 5m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection

Total Duration

3y 9m

Facilities Study50%
Queue EntryDec 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-18

About

M-Bar BESS I is a proposed 82.1 MW battery storage project in Ector County, Texas. Developed by M-Bar Energy I, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0422, with a queue entry date of December 19, 2024. The proposed commercial operation date is September 18, 2028, and the project is currently in the Facility Study phase of the interconnection process.

The project consists of 82.1 MW of battery storage capacity. The point of interconnection is the 1141 Holt Switch Substation at 138 kV.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Ector

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

M-Bar Energy I, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1141 Holt Switch Substation 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about M-Bar BESS I