Wisdom Solar SLF
299.37 MW generation in Pecos, TX · In queue since February 2025 · Proposed COD October 2027
299.37 MW
Capacity
0
Components
1y 3m
In Queue
—
IA Status
COD target: 2027
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-06
The Wisdom Solar SLF project is a proposed 299.37 MW solar generation project located in Pecos County, Texas. Developed by Wisdom Green Energy LLC, the project is interconnected within the ERCOT region and has appeared in recent news coverage. It is listed in the ERCOT interconnection queue as entry ERCOT-27INR0438, with a queue entry date of February 12, 2025, and a proposed commercial operation date of October 6, 2027.
The project utilizes photovoltaic solar technology. Its point of interconnection (POI) is Tap 138 kV #38455 HOLIDAY SUB TNP - #38450 SOAPTREE TNP. The project's interconnection status is currently listed as active.
Generated from interconnection queue and public data sources
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Wisdom Green Energy LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV #38455 HOLIDAY SUB TNP - #38450 SOAPTREE TNP
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.