Diamond Sage BESS 2
100.14 MW hybrid in Webb, TX · In queue since January 2025 · Proposed COD October 2028
100.14 MW
Capacity
0
Components
1y 4m
In Queue
—
IA Status
COD target: 2028
Total Duration
3y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-01
Diamond Sage BESS 2 is a proposed 100.14 MW hybrid battery energy storage project located in Webb County, Texas. The project, developed by DGC Renewables, LLC, is an active entry in the ERCOT interconnection queue (queue ID ERCOT-27INR0444), with a queue entry date of January 28, 2025. The proposed commercial operation date is October 1, 2028.
The project's point of interconnection (POI) is Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709).
Generated from interconnection queue and public data sources
State
TX
County
Webb
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
DGC Renewables, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV LOBO7A (80219) - FOWLERTONSW5 (5709)
Data Source
Live · ERCOT
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Diamond Sage BESS 2