watermelon 2 energy storage (ERCOT-27INR0458) — Project Summary

Queue ID
ERCOT-27INR0458
Capacity
102.1 MW
Technology
Battery
Status
active
Location
Dallas, TX
Region
ERCOT
Developer
Tempus power management LLC
IA Status

watermelon 2 energy storage

ERCOT-27INR0458BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

102.1 MW hybrid in Dallas, TX · In queue since January 2025 · Proposed COD March 2029

102.1 MW

Capacity

0

Components

1y 4m

In Queue

IA Status

COD target: 2029

Interconnection

Total Duration

4y 2m

Pre-Study0%
Queue EntryJan 13, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-01

About

The Watermelon 2 Energy Storage project is a proposed 102.1 MW hybrid battery energy storage project located in Dallas County, Texas. The developer is Tempus Power Management LLC. It is listed in the ERCOT interconnection queue as entry ERCOT-27INR0458, with a queue entry date of January 13, 2025, and a proposed commercial operation date of March 1, 2029.

The project is currently listed as active in the interconnection queue. The point of interconnection is on the 345kV line ckt 1 between substations WATMLL_W5 and TRICRN1_5.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Dallas

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tempus power management LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.

Data Source

Live · ERCOT

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about watermelon 2 energy storage