Althea Storage (ERCOT-27INR0465) — Project Summary

Queue ID
ERCOT-27INR0465
Capacity
251.3 MW
Technology
Battery
Status
active
Location
Maverick, TX
Region
ERCOT
Developer
Althea Storage LLC
IA Status
Facility Study

Althea Storage

ERCOT-27INR0465BetaActiveBatteryERCOTLBNL + Live

251.3 MW storage in Maverick, TX · Proposed COD September 2028

251.3 MW

Capacity

1

Components

Battery

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection
Facilities Study50%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-21

About

The Althea Storage project is a proposed 251.3 MW battery energy storage system in Maverick County, Texas. The project, developed by Althea Storage LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0465. The proposed commercial operation date is September 21, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The project consists of 251.3 MW of battery storage capacity. The point of interconnection is at the Tap Escondido (8260) - Brackettville (8252) location. The Althea Storage project has appeared in recent news coverage regarding energy storage development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Maverick

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Althea Storage LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap Escondido (8260) - Brackettville (8252)

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Río Escondido

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Althea Storage